  "data": {
    "indicator": {
      "slug": "wind-and-solar-farm-permitting-duration",
      "name": "Wind and solar farm permitting duration",
      "definition": "The typical current time required to obtain a permit to build a wind farm, solar farm, or grid connection.",
      "unit": "years",
      "scale": "1",
      "default_unit": "years",
      "default_scale": "1"
    },
    "scale": "1",
    "unit": "years",
    "region": {
      "code": "EU",
      "name": "European Union",
      "type": "bloc"
    },
    "points": [
      {
        "period_start": "2026-03-27",
        "period_label": "as of 27 Mar 2026",
        "value": 5,
        "scale": "1",
        "unit": "years",
        "value_type": "actual",
        "statistic_id": "stat_74A3MHP4WJFN3MXTMZEB9Y3RXF",
        "url": "https://statorigin.org/stat/stat_74A3MHP4WJFN3MXTMZEB9Y3RXF",
        "source_org": "GWEC",
        "source": {
          "org": "Global Wind Energy Council",
          "org_short_name": "GWEC",
          "document_title": "EU Commissioner on Fossil Fuels Fallout and How To Ramp Up Renewables",
          "document_url": "https://www.gwec.net/news/eu-commissioner-on-fossil-fuels-fallout-and-how-to-ramp-up-renewables",
          "locator": "Article body",
          "published_date": null
        }
      }
    ],
    "available_regions": [
      "EU"
    ]
  },
  "meta": {
    "attribution": "Data from StatOrigin (https://statorigin.org), CC BY 4.0. Attribution required.",
    "license": "https://creativecommons.org/licenses/by/4.0/",
    "docs": "https://statorigin.org/docs/api",
    "total": 1
  }
}