{
  "data": {
    "id": "org_eurelectric",
    "slug": "eurelectric",
    "name": "Eurelectric",
    "short_name": "Eurelectric",
    "type": "association",
    "tier": 2,
    "homepage": "https://www.eurelectric.org",
    "country_code": "BE",
    "reliability_note": null,
    "url": "https://statorigin.org/sources/eurelectric",
    "documents": [
      {
        "title": "Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations",
        "url": "https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/",
        "doc_type": "press_release",
        "published_date": null,
        "accessed_at": "2026-09-15",
        "license": "see-source",
        "url_status": "ok",
        "statistic_count": 1
      }
    ],
    "statistics": [
      {
        "id": "stat_01M2KJ7XC42G6MK2ANJH18YFEQ",
        "url": "https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ",
        "indicator": {
          "slug": "annual-distribution-grid-investment-requirement",
          "name": "Annual distribution grid investment requirement",
          "definition": "Annual investment required in electricity distribution grid infrastructure to support electrification and renewable energy integration."
        },
        "industry": [
          {
            "slug": "utilities",
            "name": "Electricity, gas, steam and air conditioning supply",
            "isic": "D35",
            "is_primary": true
          }
        ],
        "region": {
          "code": "EU",
          "name": "European Union",
          "type": "bloc"
        },
        "period": {
          "start": "2026-01-01",
          "end": "2026-12-31",
          "type": "year"
        },
        "value": 67,
        "value_text": "€67 billion",
        "unit": "EUR",
        "currency": "EUR",
        "scale": "billion",
        "value_type": "forecast",
        "source": {
          "org": "Eurelectric",
          "org_short_name": "Eurelectric",
          "org_url": "https://www.eurelectric.org",
          "org_tier": 2,
          "document_title": "Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations",
          "document_url": "https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/",
          "document_type": "press_release",
          "locator": "Power Distribution",
          "quote": "Our Grids for Speed study demonstrates that annual investment in distribution grids alone must double to as much\nas €67 billion to keep pace with electrification and renewable deployment.",
          "published_date": null,
          "accessed_at": "2026-09-15",
          "license": "see-source",
          "url_status": "ok"
        },
        "verification": "verified",
        "verified_by": "seed:auto-extract-v1",
        "verified_at": "2026-09-15T22:15:46.809Z",
        "confidence": 0.9,
        "is_secondhand": false,
        "supersedes": null,
        "superseded_by": null,
        "is_current": true,
        "citation": {
          "apa": "Eurelectric. (2026). Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations. Retrieved September 15, 2026, from https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ",
          "bibtex": "@misc{eurelectric2026distribution18yfeq,\n  author       = {{Eurelectric}},\n  title        = {Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations},\n  year         = {2026},\n  howpublished = {StatOrigin, https://statorigin.org},\n  url          = {https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ},\n  note         = {Original source: https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Accessed September 15, 2026.}\n}"
        },
        "updated_at": "2026-09-15T22:15:46.809Z"
      }
    ]
  },
  "meta": {
    "attribution": "Data from StatOrigin (https://statorigin.org), CC BY 4.0. Attribution required.",
    "license": "https://creativecommons.org/licenses/by/4.0/",
    "docs": "https://statorigin.org/docs/api",
    "total": 1,
    "note": "Statistics are capped at 100 per request. Use /statistics?source_org=eurelectric with a cursor to page through everything."
  }
}