Pipeline capacity
STO-REC-STAT01M2KJT1 Official
225,000barrels per day
United States · as of 30 Jun 2026
Pipeline capacity in United States reached 225,000 barrels per day as of 30 June 2026 (EIA).
- Publisher
- EIA
- Authority tier
- T1 Official
- Locator
- Coastal Bend NGL Pipeline Expansion 1 (former EPIC Y-grade pipeline)
- Retrieved
- 15 Sep 2026
- Status
- Verified
What the source says
EPIC expanded its Y-grade pipeline by 50,000 b/d for total pipeline capacity of 225,000 b/d.
Verbatim extraction verified: The figure 225,000 barrels per day is directly attested in the quoted passage (Coastal Bend NGL Pipeline Expansion 1 (former EPIC Y-grade pipeline)).
The figure above was extracted from this passage. If it does not match, the extraction is wrong and we want to know.
Cite this figure
Published under CC BY 4.0. Attribute the original publisher; the citations below do that for you and link to this permanent record.
- APA
- U.S. Energy Information Administration. (2026). Eight petroleum liquids pipeline projects have been completed since the start of 2025. Retrieved September 15, 2026, from https://www.eia.gov/todayinenergy/detail.php?id=68024. Via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC1BW4YXSVZGRDT9SXC
- MLA
- U.S. Energy Information Administration. "Eight petroleum liquids pipeline projects have been completed since the start of 2025." 2026, https://www.eia.gov/todayinenergy/detail.php?id=68024. Accessed 15 Sept. 2026 via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC1BW4YXSVZGRDT9SXC.
- Chicago
- U.S. Energy Information Administration. "Eight petroleum liquids pipeline projects have been completed since the start of 2025." 2026. https://www.eia.gov/todayinenergy/detail.php?id=68024. Accessed September 15, 2026. Cited from StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC1BW4YXSVZGRDT9SXC.
- BibTeX
- @misc{eia2026pipelinedt9sxc, author = {{U.S. Energy Information Administration}}, title = {Eight petroleum liquids pipeline projects have been completed since the start of 2025}, year = {2026}, howpublished = {StatOrigin, https://statorigin.org}, url = {https://statorigin.org/stat/stat_01M2KJ7XC1BW4YXSVZGRDT9SXC}, note = {Original source: https://www.eia.gov/todayinenergy/detail.php?id=68024. Accessed September 15, 2026.} }
Provenance and verification
Everything needed to check this number yourself, without taking our word for it.
Chain of Custody · Verification Audit
Primary Source
- Publisher
- U.S. Energy Information Administration · homepage ↗
- Authority tier
- Tier 1 · Multilateral Official
- Report
- Eight petroleum liquids pipeline projects have been completed since the start of 2025
- Type
- Press release
- Published
- —
- Locator
- Coastal Bend NGL Pipeline Expansion 1 (former EPIC Y-grade pipeline)
- Retrieved
- 15 September 2026
- Link status
- Reachable (HTTP 200)
- Report licence
- See source
Verification & Integrity
- Audit status
- Verified
- Review protocol
- Editorial review
- Checked on
- 15 September 2026
- Last revision
- 15 September 2026
- Archival URI
- /stat/stat_01M2KJ7XC1BW4YXSVZGRDT9SXC