Annual distribution grid investment requirement

STO-REC-STAT01M2KJT2 National
67 billionEUR
forecast

European Union · 2026

Eurelectric projects annual distribution grid investment requirement in the European Union at 67 billion EUR in 2026.

Original source
Publisher
Eurelectric
Authority tier
T2 National
Locator
Power Distribution
Retrieved
15 Sep 2026
Status
Verified

What the source says

Our Grids for Speed study demonstrates that annual investment in distribution grids alone must double to as much as €67 billion to keep pace with electrification and renewable deployment.

Verbatim extraction verified: The figure 67 billion EUR is directly attested in the quoted passage (Power Distribution).

The figure above was extracted from this passage. If it does not match, the extraction is wrong and we want to know.

Cite this figure

Published under CC BY 4.0. Attribute the original publisher; the citations below do that for you and link to this permanent record.

APA
Eurelectric. (2026). Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations. Retrieved September 15, 2026, from https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ
MLA
Eurelectric. "Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations." 2026, https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Accessed 15 Sept. 2026 via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ.
Chicago
Eurelectric. "Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations." 2026. https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Accessed September 15, 2026. Cited from StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ.
BibTeX
@misc{eurelectric2026distribution18yfeq, author = {{Eurelectric}}, title = {Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations}, year = {2026}, howpublished = {StatOrigin, https://statorigin.org}, url = {https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ}, note = {Original source: https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Accessed September 15, 2026.} }

Provenance and verification

Everything needed to check this number yourself, without taking our word for it.

Chain of Custody · Verification Audit
Record: STO-REC-STAT01M2KJ T2 National

Primary Source

Publisher
Eurelectric · homepage ↗
Authority tier
Tier 2 · National Official
Report
Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations
Type
Press release
Published
Locator
Power Distribution
Retrieved
15 September 2026
Link status
Reachable (HTTP 200)
Report licence
See source

Verification & Integrity

Audit status
Verified
Review protocol
Editorial review
Checked on
15 September 2026
Last revision
15 September 2026
Archival URI
/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ