Annual distribution grid investment requirement
STO-REC-STAT01M2KJT2 National
67 billionEUR
European Union · 2026
Eurelectric projects annual distribution grid investment requirement in the European Union at 67 billion EUR in 2026.
- Publisher
- Eurelectric
- Authority tier
- T2 National
- Locator
- Power Distribution
- Retrieved
- 15 Sep 2026
- Status
- Verified
What the source says
Our Grids for Speed study demonstrates that annual investment in distribution grids alone must double to as much as €67 billion to keep pace with electrification and renewable deployment.
Verbatim extraction verified: The figure 67 billion EUR is directly attested in the quoted passage (Power Distribution).
The figure above was extracted from this passage. If it does not match, the extraction is wrong and we want to know.
Cite this figure
Published under CC BY 4.0. Attribute the original publisher; the citations below do that for you and link to this permanent record.
- APA
- Eurelectric. (2026). Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations. Retrieved September 15, 2026, from https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ
- MLA
- Eurelectric. "Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations." 2026, https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Accessed 15 Sept. 2026 via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ.
- Chicago
- Eurelectric. "Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations." 2026. https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Accessed September 15, 2026. Cited from StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ.
- BibTeX
- @misc{eurelectric2026distribution18yfeq, author = {{Eurelectric}}, title = {Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations}, year = {2026}, howpublished = {StatOrigin, https://statorigin.org}, url = {https://statorigin.org/stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ}, note = {Original source: https://www.eurelectric.org/publications/acceleration-of-permits-directive-grids-package-eurelectric-recommendations-on-trilogue-negotiations/. Accessed September 15, 2026.} }
Provenance and verification
Everything needed to check this number yourself, without taking our word for it.
Chain of Custody · Verification Audit
Primary Source
- Publisher
- Eurelectric · homepage ↗
- Authority tier
- Tier 2 · National Official
- Report
- Acceleration of Permits Directive – Grids Package: Eurelectric Recommendations on Trilogue Negotiations
- Type
- Press release
- Published
- —
- Locator
- Power Distribution
- Retrieved
- 15 September 2026
- Link status
- Reachable (HTTP 200)
- Report licence
- See source
Verification & Integrity
- Audit status
- Verified
- Review protocol
- Editorial review
- Checked on
- 15 September 2026
- Last revision
- 15 September 2026
- Archival URI
- /stat/stat_01M2KJ7XC42G6MK2ANJH18YFEQ