Residential building work done quarterly growth rate
STO-REC-STAT01M2KJT1 Official
1.7%
Australia · Q1 2026
Residential building work done quarterly growth rate in Australia came in at 1.7% in Q1 2026 (ABS).
- Publisher
- ABS
- Authority tier
- T1 Official
- Locator
- Value of construction work done, chain volume measures, seasonally adjusted estimates (a)
- Retrieved
- 15 Sep 2026
- Status
- Verified
What the source says
Residential 27,867.1 1.7 9.1
Verbatim extraction verified: The figure 1.7% is directly attested in the quoted passage (Value of construction work done, chain volume measures, seasonally adjusted estimates (a)).
The figure above was extracted from this passage. If it does not match, the extraction is wrong and we want to know.
Cite this figure
Published under CC BY 4.0. Attribute the original publisher; the citations below do that for you and link to this permanent record.
- APA
- Australian Bureau of Statistics. (2026). Construction Work Done, Australia, Preliminary, June 2026. Retrieved September 15, 2026, from https://www.abs.gov.au/statistics/industry/building-and-construction/construction-work-done-australia-preliminary/jun-2026. Via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XCC37MBA7PHVQ80PHJ6
- MLA
- Australian Bureau of Statistics. "Construction Work Done, Australia, Preliminary, June 2026." 2026, https://www.abs.gov.au/statistics/industry/building-and-construction/construction-work-done-australia-preliminary/jun-2026. Accessed 15 Sept. 2026 via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XCC37MBA7PHVQ80PHJ6.
- Chicago
- Australian Bureau of Statistics. "Construction Work Done, Australia, Preliminary, June 2026." 2026. https://www.abs.gov.au/statistics/industry/building-and-construction/construction-work-done-australia-preliminary/jun-2026. Accessed September 15, 2026. Cited from StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XCC37MBA7PHVQ80PHJ6.
- BibTeX
- @misc{abs2026residential80phj6, author = {{Australian Bureau of Statistics}}, title = {Construction Work Done, Australia, Preliminary, June 2026}, year = {2026}, howpublished = {StatOrigin, https://statorigin.org}, url = {https://statorigin.org/stat/stat_01M2KJ7XCC37MBA7PHVQ80PHJ6}, note = {Original source: https://www.abs.gov.au/statistics/industry/building-and-construction/construction-work-done-australia-preliminary/jun-2026. Accessed September 15, 2026.} }
Provenance and verification
Everything needed to check this number yourself, without taking our word for it.
Chain of Custody · Verification Audit
Primary Source
- Publisher
- Australian Bureau of Statistics · homepage ↗
- Authority tier
- Tier 1 · Multilateral Official
- Report
- Construction Work Done, Australia, Preliminary, June 2026
- Type
- Press release
- Published
- —
- Locator
- Value of construction work done, chain volume measures, seasonally adjusted estimates (a)
- Retrieved
- 15 September 2026
- Link status
- Reachable (HTTP 200)
- Report licence
- See source
Verification & Integrity
- Audit status
- Verified
- Review protocol
- Editorial review
- Checked on
- 15 September 2026
- Last revision
- 15 September 2026
- Archival URI
- /stat/stat_01M2KJ7XCC37MBA7PHVQ80PHJ6