Total construction work done annual growth rate

STO-REC-STAT01M2KJT1 Official
-15.7%
estimate

Australia · Q2 2025

Total construction work done annual growth rate in Australia came in at -15.7% in Q2 2025 (ABS).

Original source
Publisher
ABS
Authority tier
T1 Official
Locator
Value of construction work done, seasonally adjusted chain volume measures
Retrieved
15 Sep 2026
Status
Verified

What the source says

Australian Capital Territory 1,012.5 -8.8 -15.7

Verbatim extraction verified: The figure -15.7% is directly attested in the quoted passage (Value of construction work done, seasonally adjusted chain volume measures).

The figure above was extracted from this passage. If it does not match, the extraction is wrong and we want to know.

Cite this figure

Published under CC BY 4.0. Attribute the original publisher; the citations below do that for you and link to this permanent record.

APA
Australian Bureau of Statistics. (2026). Construction Work Done, Australia, Preliminary, June 2026. Retrieved September 15, 2026, from https://www.abs.gov.au/statistics/industry/building-and-construction/construction-work-done-australia-preliminary/jun-2026. Via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XCDABV5TTJ4FY0D228Y
MLA
Australian Bureau of Statistics. "Construction Work Done, Australia, Preliminary, June 2026." 2026, https://www.abs.gov.au/statistics/industry/building-and-construction/construction-work-done-australia-preliminary/jun-2026. Accessed 15 Sept. 2026 via StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XCDABV5TTJ4FY0D228Y.
Chicago
Australian Bureau of Statistics. "Construction Work Done, Australia, Preliminary, June 2026." 2026. https://www.abs.gov.au/statistics/industry/building-and-construction/construction-work-done-australia-preliminary/jun-2026. Accessed September 15, 2026. Cited from StatOrigin, https://statorigin.org/stat/stat_01M2KJ7XCDABV5TTJ4FY0D228Y.
BibTeX
@misc{abs2026construction0d228y, author = {{Australian Bureau of Statistics}}, title = {Construction Work Done, Australia, Preliminary, June 2026}, year = {2026}, howpublished = {StatOrigin, https://statorigin.org}, url = {https://statorigin.org/stat/stat_01M2KJ7XCDABV5TTJ4FY0D228Y}, note = {Original source: https://www.abs.gov.au/statistics/industry/building-and-construction/construction-work-done-australia-preliminary/jun-2026. Accessed September 15, 2026.} }

Provenance and verification

Everything needed to check this number yourself, without taking our word for it.

Chain of Custody · Verification Audit
Record: STO-REC-STAT01M2KJ T1 Official

Primary Source

Publisher
Australian Bureau of Statistics · homepage ↗
Authority tier
Tier 1 · Multilateral Official
Report
Construction Work Done, Australia, Preliminary, June 2026
Type
Press release
Published
Locator
Value of construction work done, seasonally adjusted chain volume measures
Retrieved
15 September 2026
Link status
Reachable (HTTP 200)
Report licence
See source

Verification & Integrity

Audit status
Verified
Review protocol
Editorial review
Checked on
15 September 2026
Last revision
15 September 2026
Archival URI
/stat/stat_01M2KJ7XCDABV5TTJ4FY0D228Y