D35 · Electricity and Gas Utilities · Global

Onsite gas generation for data centres: upper projection endpoint

Global: 27 GW in 2030.

  • Annual Release cadence
  • 1 Record · 1 region · 2030

Verified 22 Sep 2026 · 1 publisher

CSV JSON Cite and reuse

The figure

One published observation so far. A chart follows as soon as a second period is published.

Fig 1 · D35 · 1 regionAnnual

Onsite gas generation for data centres: upper projection endpoint

Global, 2030

1 observation
27 GW Global · 2030 · IEA · full record
Source: IEA · CC BY 4.0 · statorigin.org

Every record

1 record · 1 region · 2030. Each period links to its record: the value, the quote it was read from, and the document.

Onsite gas generation for data centres: upper projection endpoint: every record, grouped by region, newest first.
Period Value Source Type
Global 1 record
2030 27 GW IEA · 16 Apr 2026 forecast

Download this data

Every file carries its provenance: the CSV has a source column per row, and the chart images print the publisher, the licence and this page's address under the drawing. Source: IEA. Licence: CC BY 4.0.

Use and publication rights

  • View, cite and link: free

    Quote any number, cite this page or a single record, and link to it anywhere.

  • Copy, chart and republish: free with attribution

    The data is published under CC BY 4.0, commercial use included. Credit StatOrigin and the original publisher (IEA); the chart files already carry that line.

  • The source documents: the publisher's terms

    Figures are facts read from the publishers' own documents. The documents themselves, their text and design, stay under each publisher's terms; follow the source links for those.

How this measure is built

Definition
Upper endpoint of IEA projected onsite natural-gas generation capacity powering data centres by 2030, mostly in the United States.
Measure
One slice of Electricity capacity ( basis: forecast high, form: level, segment: natural gas ) . Maximum electrical output capacity of power installations. Region and period are columns on every record, not slices.
Limitations
1 figure is a projection, drawn dashed and labelled in the table. Values are shown as published; StatOrigin does not revise, fill gaps or convert currencies.
Verification
Each value, unit, period and place was checked against its quote before publication. See the methodology and the corrections process.

Sources · 1 document

Document Publisher Published Data points
Executive summary – Key Questions on Energy and AI – Analysis - IEA IEA 16 Apr 2026 1

Other slices of electricity capacity

Frequently asked questions

What is the latest onsite gas generation for data centres: upper projection endpoint?

Global: 27 GW in 2030.

Where does this data come from?

From 1 document published by IEA. Every figure on this page links to its record, which quotes the sentence or table row the number was read from.

How often is it updated?

Annual. The newest published period is 2030. A new figure appears here once the publisher releases it and it passes verification.

Can I use this data?

Yes. StatOrigin publishes it under CC BY 4.0: you may copy, chart and republish it, including commercially, with attribution to StatOrigin and to the original publisher.

Cite this page

Cite the page as a data set, or open any record to cite one figure: each record carries APA, MLA, Chicago and BibTeX forms that credit the original publisher.

StatOrigin. (2026). Onsite gas generation for data centres: upper projection endpoint [Data set]. Retrieved September 29, 2026, from https://statorigin.org/indicators/data-centre-onsite-gas-power-high-iea-2026

"Onsite gas generation for data centres: upper projection endpoint." StatOrigin, 2026, https://statorigin.org/indicators/data-centre-onsite-gas-power-high-iea-2026. Accessed 29 Sep. 2026.

StatOrigin. "Onsite gas generation for data centres: upper projection endpoint." Data set, 2026. Accessed September 29, 2026. https://statorigin.org/indicators/data-centre-onsite-gas-power-high-iea-2026.

@misc{statorigin_data_centre_onsite_gas_power_high_iea_2026_2026, title = {Onsite gas generation for data centres: upper projection endpoint}, author = {{StatOrigin}}, year = {2026}, url = {https://statorigin.org/indicators/data-centre-onsite-gas-power-high-iea-2026}, note = {Data set. Accessed 2026-09-29} }