Levelised cost of electricity for concentrating solar power

Weighted-average levelised cost of electricity generated from newly commissioned concentrating solar power projects.

Unit USD/MWh Industry Electricity and Gas Utilities

Records
1
Regions
1
Period
2025
Sources
1
Verification 1 verified data points Verified 15 Sep 2026 Next update Sources typically refresh annually

The chart

The figure

One published observation so far. A chart follows as soon as a second period is published.

Levelised cost of electricity for concentrating solar power

Global, 2025

1 observation
115 USD/MWh Global · 2025 · IRENA · full record
Source: IRENA · CC BY 4.0 · statorigin.org

Every record

All records

1 record · 1 region · 2025

Levelised cost of electricity for concentrating solar power: every record, grouped by region, newest first.
Period Value Source Type
Global 1 record
2025 115 USD/MWh IRENA · 31 Dec 2025 actual

Primary documents

Sources

1 document. Each links to the publisher's own copy.

Document Publisher Published Data points
Renewable power generation costs in 2025 IRENA 1

Cite & reuse

Cite this page

Data on this page is published under CC BY 4.0. You may reuse it, including commercially, provided you attribute it. To cite one figure, open its record: each carries APA, MLA, Chicago and BibTeX forms that credit the original publisher.

StatOrigin. (2026). Levelised cost of electricity for concentrating solar power. Retrieved from https://statorigin.org/indicators/levelised-cost-of-electricity-for-concentrating-solar-power