Cumulative wind turbine capacity installed by GE Vernova

STO-REC-STATSYKRHST2 National
125GW

Global · end of 2025

Cumulative wind turbine capacity installed by GE Vernova worldwide reached 125 GW at end of 2025 (GWEC).

Original source
Publisher
GWEC
Authority tier
T2 National
Locator
Manufacturer cumulative installations
Retrieved
16 Sep 2026
Status
Verified

What the source says

Goldwind moved into second position in 2025 (163 GW), followed by Siemens Gamesa (148 GW) and GE Vernova (125 GW), while Envision became the latest manufacturer to join the ‘100+ GW’ club, reaching 103 GW in cumulative installations by the end of 2025.

Verbatim extraction verified: The figure 125 GW is directly attested in the quoted passage (Manufacturer cumulative installations).

The figure above was extracted from this passage. If it does not match, the extraction is wrong and we want to know.

Cite this figure

Published under CC BY 4.0. Attribute the original publisher; the citations below do that for you and link to this permanent record.

APA
Global Wind Energy Council. (2025). GWEC records sharp rise in wind turbine installations, as five OEMs exceed 100 GW. Retrieved September 16, 2026, from https://www.gwec.net/news/gwec-records-sharp-rise-in-wind-turbine-installations-as-five-oems-exceed-100-gw. Via StatOrigin, https://statorigin.org/stat/stat_SYKRHS3H6Q0A66Q4YF91RMS2GG
MLA
Global Wind Energy Council. "GWEC records sharp rise in wind turbine installations, as five OEMs exceed 100 GW." 2025, https://www.gwec.net/news/gwec-records-sharp-rise-in-wind-turbine-installations-as-five-oems-exceed-100-gw. Accessed 16 Sept. 2026 via StatOrigin, https://statorigin.org/stat/stat_SYKRHS3H6Q0A66Q4YF91RMS2GG.
Chicago
Global Wind Energy Council. "GWEC records sharp rise in wind turbine installations, as five OEMs exceed 100 GW." 2025. https://www.gwec.net/news/gwec-records-sharp-rise-in-wind-turbine-installations-as-five-oems-exceed-100-gw. Accessed September 16, 2026. Cited from StatOrigin, https://statorigin.org/stat/stat_SYKRHS3H6Q0A66Q4YF91RMS2GG.
BibTeX
@misc{gwec2025cumulativerms2gg, author = {{Global Wind Energy Council}}, title = {GWEC records sharp rise in wind turbine installations, as five OEMs exceed 100 GW}, year = {2025}, howpublished = {StatOrigin, https://statorigin.org}, url = {https://statorigin.org/stat/stat_SYKRHS3H6Q0A66Q4YF91RMS2GG}, note = {Original source: https://www.gwec.net/news/gwec-records-sharp-rise-in-wind-turbine-installations-as-five-oems-exceed-100-gw. Accessed September 16, 2026.} }

Provenance and verification

Everything needed to check this number yourself, without taking our word for it.

Chain of Custody · Verification Audit
Record: STO-REC-STATSYKRHS T2 National

Primary Source

Publisher
Global Wind Energy Council · homepage ↗
Authority tier
Tier 2 · National Official
Report
GWEC records sharp rise in wind turbine installations, as five OEMs exceed 100 GW
Type
Press release
Published
Locator
Manufacturer cumulative installations
Retrieved
16 September 2026
Link status
Reachable (HTTP 200)
Report licence
See source

Verification & Integrity

Audit status
Verified
Review protocol
Editorial review
Checked on
17 September 2026
Last revision
17 September 2026
Archival URI
/stat/stat_SYKRHS3H6Q0A66Q4YF91RMS2GG