Electricity grid length to be built or modernised
The length of electricity grid infrastructure that needs to be built or modernised to integrate renewables by a target year.
Unit million kilometres Industry Electricity and Gas Utilities
The chart
The figure
One published observation so far. A chart follows as soon as a second period is published.
Electricity grid length to be built or modernised
Global, end of 2030
Every record
All records
1 record · 1 region · 2030
| Period | Value | Source | Type |
|---|---|---|---|
| Global 1 record | |||
| end of 2030 | 25 million kilometres | IEA · 31 Dec 2030 | forecast |
Primary documents
Sources
1 document. Each links to the publisher's own copy.
| Document | Publisher | Published | Data points |
|---|---|---|---|
| Massive global growth of renewables to 2030 is set to match entire power capacity of major economies today, moving world closer to tripling goal | IEA | — | 1 |
Cite & reuse
Cite this page
Data on this page is published under CC BY 4.0. You may reuse it, including commercially, provided you attribute it. To cite one figure, open its record: each carries APA, MLA, Chicago and BibTeX forms that credit the original publisher.
StatOrigin. (2026). Electricity grid length to be built or modernised. Retrieved from https://statorigin.org/indicators/electricity-grid-length-to-be-built-or-modernised