C29 · Electric Vehicles · Global

Required growth multiple for public charging by 2035

Global: 6 times in 2035.

  • Annual Release cadence
  • 1 Record · 1 region · 2035

Verified 27 Sep 2026 · 1 publisher

The figure

One published observation so far. A chart follows as soon as a second period is published.

Fig 1 · C29 · 1 regionAnnual

Required growth multiple for public charging by 2035

Global, 2035

1 observation
6 times Global · 2035 · IEA · full record
Source: IEA · CC BY 4.0 · statorigin.org

Every record

1 record · 1 region · 2035. Each period links to its record: the value, its source evidence and original document.

Required growth multiple for public charging by 2035: every record, grouped by region, newest first.
Period Value Source Type
Global 1 record
2035 6 times IEA · 31 Dec 2035 forecast

Download this data

Every file carries its provenance: the CSV has a source column per row, and the chart images print the publisher, the licence and this page's address under the drawing. Source: IEA. Licence: CC BY 4.0.

Use and publication rights

  • View, cite and link: free

    Quote any number, cite this page or a single record, and link to it anywhere.

  • Copy, chart and republish: free with attribution

    The data is published under CC BY 4.0, commercial use included. Credit StatOrigin and the original publisher (IEA); the chart files already carry that line.

  • The source documents: the publisher's terms

    Figures are facts read from the publishers' own documents. The documents themselves, their text and design, stay under each publisher's terms; follow the source links for those.

How this measure is built

Definition
Factor by which public charging needs to increase by 2035 to reach deployment levels under a stated policy scenario.
Measure
One slice of Charging capacity growth multiple ( form: level, segment: public ) . Factor by which vehicle charging capacity must increase relative to a baseline to satisfy demand. Region and period are columns on every record, not slices.
Limitations
1 figure is a projection, drawn dashed and labelled in the table. Values are shown as published; StatOrigin does not revise, fill gaps or convert currencies.
Verification
Each value, unit, period and place was checked against its source evidence before publication. See the methodology and the corrections process.

Sources · 1 document

Document Publisher Published Data points
Executive summary – Global EV Outlook 2024 IEA — 1

Other slices of charging capacity growth multiple

Frequently asked questions

What is the latest required growth multiple for public charging by 2035?

Global: 6 times in 2035.

Where does this data come from?

From 1 document published by IEA. Every figure on this page links to its record, which preserves the original source evidence.

How often is it updated?

Annual. The newest published period is 2035. A new figure appears here once the publisher releases it and it passes verification.

Can I use this data?

Yes. StatOrigin publishes it under CC BY 4.0: you may copy, chart and republish it, including commercially, with attribution to StatOrigin and to the original publisher.

Cite this page

Cite the page as a data set, or open any record to cite one figure: each record carries APA, MLA, Chicago and BibTeX forms that credit the original publisher.

StatOrigin. (2026). Required growth multiple for public charging by 2035 [Data set]. Retrieved October 22, 2026, from https://statorigin.org/indicators/required-growth-multiple-for-public-charging

"Required growth multiple for public charging by 2035." StatOrigin, 2026, https://statorigin.org/indicators/required-growth-multiple-for-public-charging. Accessed 22 Oct. 2026.

StatOrigin. "Required growth multiple for public charging by 2035." Data set, 2026. Accessed October 22, 2026. https://statorigin.org/indicators/required-growth-multiple-for-public-charging.

@misc{statorigin_required_growth_multiple_for_public_charging_2026, title = {Required growth multiple for public charging by 2035}, author = {{StatOrigin}}, year = {2026}, url = {https://statorigin.org/indicators/required-growth-multiple-for-public-charging}, note = {Data set. Accessed 2026-10-22} }